{"id":6450,"date":"2025-03-25T09:14:59","date_gmt":"2025-03-25T09:14:59","guid":{"rendered":"https:\/\/www.id-11.it\/news\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/"},"modified":"2025-03-31T12:36:20","modified_gmt":"2025-03-31T12:36:20","slug":"contracts-and-procurement-planning-in-the-new-public-procurement-code","status":"publish","type":"post","link":"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/","title":{"rendered":"Contracts and procurement: planning in the New Public Procurement Code"},"content":{"rendered":"\n<p>With the entry into force of the <strong>New Public Contracts Code <\/strong>(Legislative Decree 36\/2023), procurement planning is no longer just a good management practice, but becomes a regulatory obligation for all Public Administrations. Proper planning, in fact, is the first and indispensable step to ensure <strong>transparency, efficiency, quality and legality in every procurement procedure<\/strong>. <\/p>\n\n<p>Under the new regulatory framework, PAs must adopt digital tools and advanced methodologies such as <a href=\"https:\/\/id-bim.it\/\">BIM,<\/a> embedding planning within an integrated strategy for managing the entire procurement cycle. The absence of accurate, Code-compliant planning can undermine the legitimacy of procedures and prevent access to public funding. <\/p>\n\n<h4 class=\"wp-block-heading\"><strong>With the New Public Procurement Code, planning is no longer a choice: it is a regulatory obligation<\/strong><\/h4>\n\n<p>Procurement planning today is not limited to choosing the most advantageous supplier or negotiating contract clauses. It must respond to precise legal obligations and include a series of strategic activities geared toward: <\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>Identify needs in a structured way:<\/strong> through the timely definition of public objectives and biennial procurement planning, as required by Articles 37 and 38 of the Code<\/li>\n\n\n\n<li><strong>Allocate<\/strong> economic, technical, and human <strong>resources<\/strong> in a manner consistent with budgetary constraints and timelines<\/li>\n\n\n\n<li><strong>Rigorously schedule time:<\/strong> establishing timetables that conform to the procedural timelines and implementation schedules required by the regulations<\/li>\n\n\n\n<li><strong>Control and report costs:<\/strong> in a traceable and documented way, as required by the digitization of public contracts.<\/li>\n<\/ul>\n\n<h4 class=\"wp-block-heading\"><strong>Essential elements of planning in compliance with the New Code<\/strong><\/h4>\n\n<ul class=\"wp-block-list\">\n<li><strong>Binding timeline<\/strong>\n<ul class=\"wp-block-list\">\n<li>Setting deadlines, from design to publication of the call for bids to the execution phase, is now an integral part of the mandatory documentation to call for tenders<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Transparent economic evaluation<\/strong>\n<ul class=\"wp-block-list\">\n<li>Costs must be estimated in a timely and up-to-date manner, using official price lists and sustainability criteria, as required by Article 41 of the Code <\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Prior analysis of available resources<\/strong>\n<ul class=\"wp-block-list\">\n<li>Contracting stations should check in advance the availability of internal and external resources (skills, suppliers, technologies), including to assess the advisability of aggregating purchases<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Accurate drafting of tender documents<\/strong>\n<ul class=\"wp-block-list\">\n<li>Specifications, contracts, and specifications must be consistent with the project and the digital arrangements under the new public contract ecosystem<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Digital communication and interoperability<\/strong>\n<ul class=\"wp-block-list\">\n<li>The management of communications and document flows must be in electronic format, in compliance with the interoperable standards set by the Code.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<h4 class=\"wp-block-heading\"><strong>Time, cost and resources: how to avoid mistakes and defaults<\/strong><\/h4>\n\n<p>Sloppy planning can result in delays, increased costs, litigation and, in the most serious cases, cancellation of the bidding process. Therefore, the New Code provides: <\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>Timing:<\/strong> constant monitoring using <em>project management <\/em>tools and data interoperability<\/li>\n\n\n\n<li><strong>Costs:<\/strong> adoption of <em>value engineering<\/em> and transparent economic models to avoid waste<\/li>\n\n\n\n<li><strong>Resources:<\/strong> qualification and informed choice of suppliers and economic operators, including through dynamic lists.<\/li>\n<\/ul>\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.id-11.it\/wp-content\/uploads\/2025\/03\/0196W057as-1-1024x683.png\" alt=\"Contracts and procurement: planning in the New Procurement Code - id 11\" class=\"wp-image-6444\" srcset=\"https:\/\/www.id-11.it\/wp-content\/uploads\/2025\/03\/0196W057as-1-1024x683.png 1024w, https:\/\/www.id-11.it\/wp-content\/uploads\/2025\/03\/0196W057as-1-300x200.png 300w, https:\/\/www.id-11.it\/wp-content\/uploads\/2025\/03\/0196W057as-1-768x512.png 768w, https:\/\/www.id-11.it\/wp-content\/uploads\/2025\/03\/0196W057as-1-1536x1024.png 1536w, https:\/\/www.id-11.it\/wp-content\/uploads\/2025\/03\/0196W057as-1.png 1800w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<h4 class=\"wp-block-heading\"><strong>Digitization as an enabling condition<\/strong><\/h4>\n\n<p>The New Procurement Code mandates the use of certified digital platforms, <strong>Common Data<\/strong> Environments <strong>(CDEs)<\/strong> and, in major works, the mandatory adoption of <strong>Building Information Modeling (BIM).<\/strong> Planning must therefore be based on structured data and IT tools capable of supporting the PA throughout the procurement life cycle. <\/p>\n\n<h4 class=\"wp-block-heading\"><strong>A strategic phase, which cannot be postponed<\/strong><\/h4>\n\n<p>For public administrations, adapting to the new regulatory framework is now an urgent and urgent necessity. Planning is not only a duty, but a strategic lever that ensures efficiency, transparency and quality in public spending. <\/p>\n\n<p>Relying on qualified professionals <a href=\"https:\/\/www.id-11.it\/en\/services\/\">such as Id 11,<\/a> capable of integrating technical, regulatory and digital expertise, is the winning choice to accompany PAs in the full implementation of the Code.  <\/p>\n\n<figure class=\"wp-block-pullquote\"><blockquote><p><strong>Competent planning today means preventing critical issues tomorrow and ensuring successful procurement.<\/strong><\/p><\/blockquote><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>With the entry into force of the New Public Contracts Code (Legislative Decree 36\/2023), procurement planning is no longer just a good management practice, but becomes a regulatory obligation for all Public Administrations. Proper planning, in fact, is the first and indispensable step to ensure transparency, efficiency, quality and legality in every procurement procedure. Under [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6447,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43,45],"tags":[117,118,129,158,263,264],"class_list":["post-6450","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-events","category-projects","tag-bim-en","tag-bim-in-construction","tag-bim-technology","tag-digitization","tag-procurement-code-en","tag-programming"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Planning in the New Public Procurement Code - Id 11<\/title>\n<meta name=\"description\" content=\"Procurement planning is no longer just good management practice, but a regulatory requirement for all government agencies.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Planning in the New Public Procurement Code - Id 11\" \/>\n<meta property=\"og:description\" content=\"Procurement planning is no longer just good management practice, but a regulatory requirement for all government agencies.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/\" \/>\n<meta property=\"og:site_name\" content=\"Id 11\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-25T09:14:59+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-03-31T12:36:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.id-11.it\/wp-content\/uploads\/2025\/03\/0196W057as_2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1800\" \/>\n\t<meta property=\"og:image:height\" content=\"1200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Idgr0up\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Idgr0up\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/\"},\"author\":{\"name\":\"Idgr0up\",\"@id\":\"https:\/\/www.id-11.it\/en\/#\/schema\/person\/afc3121cf9d04a17c720dd1a6359c44f\"},\"headline\":\"Contracts and procurement: planning in the New Public Procurement Code\",\"datePublished\":\"2025-03-25T09:14:59+00:00\",\"dateModified\":\"2025-03-31T12:36:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/\"},\"wordCount\":588,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.id-11.it\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.id-11.it\/wp-content\/uploads\/2025\/03\/0196W057as_2.png\",\"keywords\":[\"BIM\",\"BIM in construction\",\"BIM technology\",\"digitization\",\"Procurement Code\",\"programming\"],\"articleSection\":[\"Events\",\"Projects\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/\",\"url\":\"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/\",\"name\":\"Planning in the New Public Procurement Code - Id 11\",\"isPartOf\":{\"@id\":\"https:\/\/www.id-11.it\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.id-11.it\/wp-content\/uploads\/2025\/03\/0196W057as_2.png\",\"datePublished\":\"2025-03-25T09:14:59+00:00\",\"dateModified\":\"2025-03-31T12:36:20+00:00\",\"description\":\"Procurement planning is no longer just good management practice, but a regulatory requirement for all government agencies.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/#primaryimage\",\"url\":\"https:\/\/www.id-11.it\/wp-content\/uploads\/2025\/03\/0196W057as_2.png\",\"contentUrl\":\"https:\/\/www.id-11.it\/wp-content\/uploads\/2025\/03\/0196W057as_2.png\",\"width\":1800,\"height\":1200,\"caption\":\"Contratti e appalti: la pianificazione nel Nuovo Codice degli Appalti - id 11\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.id-11.it\/en\/architecture-and-engineering\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Contracts and procurement: planning in the New Public Procurement Code\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.id-11.it\/en\/#website\",\"url\":\"https:\/\/www.id-11.it\/en\/\",\"name\":\"Id 11\",\"description\":\"Ingegneria e Architettura\",\"publisher\":{\"@id\":\"https:\/\/www.id-11.it\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.id-11.it\/en\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.id-11.it\/en\/#organization\",\"name\":\"Id 11\",\"url\":\"https:\/\/www.id-11.it\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.id-11.it\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.id-11.it\/wp-content\/uploads\/2023\/08\/id-11.png\",\"contentUrl\":\"https:\/\/www.id-11.it\/wp-content\/uploads\/2023\/08\/id-11.png\",\"width\":1000,\"height\":920,\"caption\":\"Id 11\"},\"image\":{\"@id\":\"https:\/\/www.id-11.it\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.id-11.it\/en\/#\/schema\/person\/afc3121cf9d04a17c720dd1a6359c44f\",\"name\":\"Idgr0up\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.id-11.it\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0b58b96c59b4ec3e197b7c62dc0937a893b908d73bdca4afa0e3fa687abe8889?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0b58b96c59b4ec3e197b7c62dc0937a893b908d73bdca4afa0e3fa687abe8889?s=96&d=mm&r=g\",\"caption\":\"Idgr0up\"},\"sameAs\":[\"https:\/\/www.id-11.it\"],\"url\":\"https:\/\/www.id-11.it\/en\/author\/idgr0up\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Planning in the New Public Procurement Code - Id 11","description":"Procurement planning is no longer just good management practice, but a regulatory requirement for all government agencies.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/","og_locale":"en_US","og_type":"article","og_title":"Planning in the New Public Procurement Code - Id 11","og_description":"Procurement planning is no longer just good management practice, but a regulatory requirement for all government agencies.","og_url":"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/","og_site_name":"Id 11","article_published_time":"2025-03-25T09:14:59+00:00","article_modified_time":"2025-03-31T12:36:20+00:00","og_image":[{"width":1800,"height":1200,"url":"https:\/\/www.id-11.it\/wp-content\/uploads\/2025\/03\/0196W057as_2.png","type":"image\/png"}],"author":"Idgr0up","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Idgr0up","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/#article","isPartOf":{"@id":"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/"},"author":{"name":"Idgr0up","@id":"https:\/\/www.id-11.it\/en\/#\/schema\/person\/afc3121cf9d04a17c720dd1a6359c44f"},"headline":"Contracts and procurement: planning in the New Public Procurement Code","datePublished":"2025-03-25T09:14:59+00:00","dateModified":"2025-03-31T12:36:20+00:00","mainEntityOfPage":{"@id":"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/"},"wordCount":588,"commentCount":0,"publisher":{"@id":"https:\/\/www.id-11.it\/en\/#organization"},"image":{"@id":"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/#primaryimage"},"thumbnailUrl":"https:\/\/www.id-11.it\/wp-content\/uploads\/2025\/03\/0196W057as_2.png","keywords":["BIM","BIM in construction","BIM technology","digitization","Procurement Code","programming"],"articleSection":["Events","Projects"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/","url":"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/","name":"Planning in the New Public Procurement Code - Id 11","isPartOf":{"@id":"https:\/\/www.id-11.it\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/#primaryimage"},"image":{"@id":"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/#primaryimage"},"thumbnailUrl":"https:\/\/www.id-11.it\/wp-content\/uploads\/2025\/03\/0196W057as_2.png","datePublished":"2025-03-25T09:14:59+00:00","dateModified":"2025-03-31T12:36:20+00:00","description":"Procurement planning is no longer just good management practice, but a regulatory requirement for all government agencies.","breadcrumb":{"@id":"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/#primaryimage","url":"https:\/\/www.id-11.it\/wp-content\/uploads\/2025\/03\/0196W057as_2.png","contentUrl":"https:\/\/www.id-11.it\/wp-content\/uploads\/2025\/03\/0196W057as_2.png","width":1800,"height":1200,"caption":"Contratti e appalti: la pianificazione nel Nuovo Codice degli Appalti - id 11"},{"@type":"BreadcrumbList","@id":"https:\/\/www.id-11.it\/en\/events\/contracts-and-procurement-planning-in-the-new-public-procurement-code\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.id-11.it\/en\/architecture-and-engineering\/"},{"@type":"ListItem","position":2,"name":"Contracts and procurement: planning in the New Public Procurement Code"}]},{"@type":"WebSite","@id":"https:\/\/www.id-11.it\/en\/#website","url":"https:\/\/www.id-11.it\/en\/","name":"Id 11","description":"Ingegneria e Architettura","publisher":{"@id":"https:\/\/www.id-11.it\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.id-11.it\/en\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.id-11.it\/en\/#organization","name":"Id 11","url":"https:\/\/www.id-11.it\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.id-11.it\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.id-11.it\/wp-content\/uploads\/2023\/08\/id-11.png","contentUrl":"https:\/\/www.id-11.it\/wp-content\/uploads\/2023\/08\/id-11.png","width":1000,"height":920,"caption":"Id 11"},"image":{"@id":"https:\/\/www.id-11.it\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.id-11.it\/en\/#\/schema\/person\/afc3121cf9d04a17c720dd1a6359c44f","name":"Idgr0up","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.id-11.it\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0b58b96c59b4ec3e197b7c62dc0937a893b908d73bdca4afa0e3fa687abe8889?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0b58b96c59b4ec3e197b7c62dc0937a893b908d73bdca4afa0e3fa687abe8889?s=96&d=mm&r=g","caption":"Idgr0up"},"sameAs":["https:\/\/www.id-11.it"],"url":"https:\/\/www.id-11.it\/en\/author\/idgr0up\/"}]}},"_links":{"self":[{"href":"https:\/\/www.id-11.it\/en\/wp-json\/wp\/v2\/posts\/6450","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.id-11.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.id-11.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.id-11.it\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.id-11.it\/en\/wp-json\/wp\/v2\/comments?post=6450"}],"version-history":[{"count":1,"href":"https:\/\/www.id-11.it\/en\/wp-json\/wp\/v2\/posts\/6450\/revisions"}],"predecessor-version":[{"id":6451,"href":"https:\/\/www.id-11.it\/en\/wp-json\/wp\/v2\/posts\/6450\/revisions\/6451"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.id-11.it\/en\/wp-json\/wp\/v2\/media\/6447"}],"wp:attachment":[{"href":"https:\/\/www.id-11.it\/en\/wp-json\/wp\/v2\/media?parent=6450"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.id-11.it\/en\/wp-json\/wp\/v2\/categories?post=6450"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.id-11.it\/en\/wp-json\/wp\/v2\/tags?post=6450"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}